FORT BRAGG, Mendocino County — November 20, 2026. Two key road corridors serving Fort Bragg appear in Caltrans District 1's November 20–26 construction bulletin. Drivers using Highway 1 along the south side of town, as well as Highway 20 heading east, should allow for separate work zones.

Highway 1: Hare Creek to Noyo River bridges

The agency lists continuing construction on Route 1 between Hare Creek Bridge 10-175 and Noyo River Bridge 10-176, postmiles 59.6–60.6. Lane closures are scheduled from 7 a.m. to 3 p.m., with minor slowdowns anticipated. This is not an announced citywide road closure.

Highway 20: Pine Tree Lane and eastward

Caltrans also reports ongoing utility work on Route 20 between Symes Lane and Pine Tree Lane, as well as between Pine Tree Lane and Camp One Access Road farther east. One-way controls may be used during listed 8 a.m.–7:30 p.m. work periods, with delays of up to five minutes. Conditions at each site can differ.

What about Thanksgiving?

The state generally plans to pause routine Northern California work from November 26 through November 29 but can respond to emergencies. Holiday visitors planning trips along the coast should consult live highway conditions and local access notices before setting out.

Primary source and updates

Caltrans District 1 weekly road bulletin, issued November 20 for November 20–26, 2026. Live updates: Caltrans QuickMap and California Highway Information Network. Road schedules and estimated delays can change. The featured image is illustrative, not photographic evidence of this exact work zone on November 20.

California58 News | Independently prepared November 20, 2026.

Help Fort Bragg News grow Help strengthen reporting on Fort Bragg: community voices, important decisions and local life.
Support Fort Bragg News

Choose how to support Fort Bragg News:

Credit / Debit Card via Stripe

Choose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Fort Bragg News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.

Fort Bragg News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Fort Bragg News newsroom →

More from Fort Bragg News

Visit Fort Bragg News →

СООБЩЕСТВО

Комментарии

Присоединяйтесь к обсуждению California58. Чтобы комментировать, необходимо войти в аккаунт.